A two-storey garage conversion and ADU. I wrote the design intent, and the permit set was drawn from it.
The design-intent document is organised room by room — lighting, outlets, switching and dimming zones, finishes, design choices, and the questions the architect needed to answer. The design-build firm's drafter worked inside that document rather than beside it, resolving specifics against my lines as the set came together.
- Specified the palette: moss green and a warm white, waterproof microcement in a warm limestone beige through both bathrooms, burnished brass sealed.
- Specified the lighting to buyable detail — everything on dimmers, 2" recessed 3000K downlights in matt white trim, 95+ CRI at the mirrors, LED strip mudded into a recessed channel rather than surface-mounted.
- Marked up each plan revision in the drafter's terms: an extra foot towards the house, a ribbon window in the lower bathroom, the toilet and sink switched.
- Caught a dimension error on site — the plans assumed seven feet between the neighbouring house and the existing garage. Measured, it was six. Found before the set was priced.